Time Lock All sub Cues
Posted: Fri Mar 05, 2010 3:57 pm
I would like to see the ability to time lock(link) sub cues to each other. Currently to my understanding sub components with the same length are linked and can be scrubbed together and guaranty sample based sync. I would like to see this extended to any sub cue so I can seek to a specific time in the files and all sub parts of the cue will be where they should be in relation to the first cue. If I build a long sequence of evnets with many layers of sub components such as a thunderstorm and the director wants to stop in rehearsal and to give notes in the middle of the scene and then continue where we left off I have no way of getting to a specific part of a cue. I would want it to determine new start times as I scrolled in time in any sub component and skip the cues that I pass. for example if I start the storm cue and then move to 5 min in on the rain track it would skip the thunder with the relative start time of 3 min and the thunder at 6 min would fire in 1 min time.
This type of feature feels like a logical extension of the already existing linking feature. I can see two possible implementations of this feature. The first is that all sub components are automaticly linked together and the second could give a check box that allows me to choose if i want time linking or not for specific sub cues.
alabau
This type of feature feels like a logical extension of the already existing linking feature. I can see two possible implementations of this feature. The first is that all sub components are automaticly linked together and the second could give a check box that allows me to choose if i want time linking or not for specific sub cues.
